The easiest mistake to make when building a pig farm is realizing the site was chosen incorrectly only after the bulldozers arrive. The site and layout are “built-in conditions”; no matter how meticulous management is later, it is difficult to make up for structural shortcomings in site selection or zoning.

The first requirement for site selection is compliance. The site must avoid prohibited and restricted farming areas and be far from residential areas, water source protection areas, major roads, and other areas with a high concentration of livestock farms. In industry practice, the distance from major roads, residential areas, other farms, and slaughterhouses is generally required to be at least 1000 meters. Even more important than “meeting the distance requirement” are natural barriers—a site surrounded by mountains and forests or rivers, or located in an isolated area, can significantly reduce interference from outside traffic, people, and logistics. This kind of natural isolation is more reliable than any artificial disinfection facility. In terms of terrain, high, dry land with good drainage and a groundwater level below 2 meters is a basic requirement. A slope of 1% to 3% is preferable: it supports drainage without making transportation difficult.

Once the site is selected, the layout is what truly determines a pig farm’s “disease prevention capability.” The core principle is: zoning, grading, and one-way movement. A well-designed farm site should be divided into at least four functional areas: the residential and management area, located upwind or to the side and upwind, is the clean area for personnel and offices; the production support area (such as feed warehouses and power distribution rooms) serves as a buffer; the production area is arranged according to the disease resistance of the pig groups, from boar housing, breeding and gestation housing, farrowing housing, nursery housing, to finishing housing, in sequence from upwind to downwind along the prevailing wind direction. A spacing of more than 15 meters between housing for each stage is recommended; the environmental protection isolation area should be placed at the lowest point of the entire farm and downwind, with manure and wastewater treatment and harmless treatment facilities grouped together.

“One-way movement” is not just a slogan; it must be reflected in the design of roads and passageways. The clean route within the farm is for feed and personnel, while the dirty route is for outgoing pigs and manure and wastewater; the two routes must never cross. Delivery vehicles, livestock transport vehicles, and manure and wastewater transport vehicles each have separate parking and disinfection points. Vehicles do not enter the farm, and supplies are handed over in the buffer area. Provide a shower and changing area at the personnel entrance, and clearly design the physical route “from dirty to clean” so that management has a basis for implementation.

One often-underestimated detail is the spacing between pig houses. 15 meters is not an arbitrary figure—it leaves room for air circulation, mechanical manure removal, and emergency isolation. Where land conditions allow, increasing the spacing is more effective at reducing the likelihood of cross-infection than adding disinfection equipment inside the pig houses. Spending an extra month on preparation during site selection and layout is far more cost-effective than making changes after the farm begins operating.